US 220
Appalachian Thruway
Bud Shuster Highway


Well this is it, the ugly stepchild to Interstate 99, or is that the other way around?  The highway that for many years was king through the Appalachian spine has been demoted and replaced by the designation that is a thorn in many people's sides:  I-99.

In 1928, the northern entrance was moved from the New York state line north of Lawrenceville to the border at South Waverly.  From when it was signed in 1926 until that year, it turned north at Williamsport to follow the current US 15 alignment using Water Street, Race Street, and Lycoming Creek Road.  Then the route changed to follow West Fourth Street, Campbell Street, High Street, Hepburn Street, Market Street, and Washington Street.  Also that year, the route was under construction from Lakemont to Greenwood and concluded a year later.

The route through Williamsport was change again in 1934 when it was signed on Harris Place between Hepburn Street and Market Street to provide a shorter path.  In 1938, the highway was widened between Duncansville and Hollidaysburg.

Widening continued into the next decade when sections in Tipton to Tyrone, in Jersey Shore, Westminster Drive to Montoursville, and Athens to Sayer taking place in 1940.  In 1941, the highway was widened from Hiller Road to Old Cement Road and the route changed to its current alignment between I-180 and Hughesville.  Prior to that year, it continued south on Susquehanna Trail to Muncy then on the current PA 405 alignment to Hughesville.  Another change in the routing took place in 1946, when the designation swapped alignments with PA 64 between Milesburg and Mill Hall.  The route followed the current PA 144/PA 150 to Bellefonte, PA 550 to Zion, and PA 64 to Mill Hall.  Another change took place in Williamsport, with northbound traffic following Hepburn Street, Seventh Street, and Market Street and southbound signed on Market Street, and Hepburn Street.  Also that year, the highway was widened between Tipton and Bellewood.  In 1948, the southbound route was changed again in Williamsport to follow Hepburn Street, Pine Street, Sixth Street, and Market Street.  In 1949, the highway was widened from Greenwood to Bellewood, in Avis, and from Williamsport to Westminster Drive.

The 1950s saw the widening work continue with sections in Bedford and from Palmers Lake to Williamsport which was completed in 1951.  In 1956, the highway was widened at the interchange with the Pennsylvania Turnpike in Bedford.  In 1958, widening took place from Montoursville to Halls and in Towanda.  Also in that same year, a median was installed from Hollidaysburg to Lakemont, Greenwood to the Antis Township line, and Plank Road to Pine Run Road.

The 1960s began with the section from Pine Run Road to Williamsport getting a median in 1960.  In 1961, construction began on the northbound alignment of Pleasant Valley Boulevard from South 22nd Street to South Second Street and a median was installed between PA 36 and South 22nd Street.  It would receive the designation for northbound US 220 while the original path became the southbound lanes a year later.  The designation swapped alignments with PA 36 in 1964, with PA 36 moving to Logan Boulevard and US 220 to Plank Road between Hollidaysburg and Altoona.  Also in 1964, the highway was widened between Country Club Lane and Flemington while a median was installed on the route through Montoursville.  In 1965, the alignment changed courses again in Williamsport, this time both directions were signed on the same course on Hepburn Street and Market Street.  In 1966, construction on the portion of Interstate 80 that carries the US 220 designation began from Exit 158 to Exit 161.  In 1967, construction was extended from Exit 161 to Exit 173 while the first segment of lone US 220 expressway began from Avis to Jersey Shore.  Construction on an at-grade section began from Milesburg to Blanchard that year as well, due to the construction of Foster Joseph Sayers Dam and creation of the lake by the same name.  The former alignment is still used for access to the lake and can be seen at Alex Nitzman's Abandoned U.S. 220 page.  A year later, the section between PA 26 and Blanchard opened.  In 1968, the section from Exit 161 to Exit 173 opened while construction began from that exit to Exit 178.  Many segments opened in 1969:  Milesburg to PA 26, the first section of US 220 expressway from Avis to Thomas Street, and from Exit 158 to Exit 161 on Interstate 80.  Not only did sections open, but another got under way that year from Business US 220 to PA 56 in Bedford and Thomas Street to Plank Road in Lycoming County even a widening project from Milesburg to I-80.

The 1970s began with the opening of the Bedford Bypass from Business US 220 to PA 56, Exit 173 to Exit 178, and the section of from Thomas Street to Plank Road in 1970 as well as completion of the widened route from Milesburg to I-80 with a median.  Three more projects began that year:  Tyrone Bypass from the Tipton/Grazierville interchange to PA 350, from the US 220 alignment to the Reach Road interchange in Williamsport, and from PA 199 to Pine Street.  In 1971, the Bedford Bypass received the US 220 designation while construction began from Maynard Street to Hepburn Street.  The Bellefonte Bypass also started in 1971 and opened the following year as a "Super-2" expressway, a two-lane expressway built on a four-lane right-of-way.  Construction began in 1972 from Reach Road to Maynard Street and Hepburn Street to the Market Street Bridge.  In Bradford County, the new expressway segment from PA 199 to Pine Street opened while work began from there to the Southern Tier Expressway near South Waverly.  In 1973, the section from West Fourth Street to Reach Road opened while at the same time construction began on sections from the Wayne Township line to the Susquehanna River and from the Bradford County Airport to US 6 near Towanda.  Two more sections of expressway would open in 1974:  Maynard Street to Hepburn Street and Pine Street to the Southern Tier Expressway which became the new northern terminus.  The designation was removed from Keystone Avenue, Mohawk Street, and Spring Street through Athens, Sayre, and South Waverly.  Construction began in 1974 on sections from PA 477 to the Castanea Township line and from the Susquehanna River to Avis.  Even widening work took place that year from Sonestown to Wrights View.  In 1975, work began on the sections of expressway from PA 56 to the Blair County line, Eagle Township line to the Wayne Township line, and PA 87 to Pennsdale.  Opening that year was the section from Reach Road to Hepburn Street which caused the designation to be changed to Front Street, Mulberry Street, and Washington Boulevard.  The Tyrone and Towanda bypasses opened to traffic in the year of the bicentennial, while another change in the routing took place in Williamsport.  The designation was placed on Third Street and southbound traffic used Basin Street and Fourth Street in downtown.  In 1977, several more sections opened to traffic from PA 447 to Lock Haven, current PA 150 interchange to Avis (which eliminated the temporary interchange at Central Avenue), and Third Street to Pennsdale.  In 1978, the section from PA 120 to PA 150 opened and the US 220 designation moved onto Interstate 80 from Exit 158 to Exit 178 and the new expressway between Milesburg and Avis.

The 1980s began with more sections of expressway opening from PA 56 to the King/Claysburg interchange and from Hepburn Street to the Faxon interchange in 1980.  Blair County would finally see construction taking place in 1982, when the section between the Newry Lane underpass to the Plank Road interchange was started.  Construction continued in Lycoming County, this time to fill in the gap between the Faxon interchange and Third Street.  Construction was extended from Plank Road to 17th Street two years later, at the same time the gap between Faxon and Third Street was completed.  Once that section was completed, PennDOT multiplexed US 220 with the Interstate 180 designation.  In 1986, this section from a temporary Newry Lane interchange to 17th Street opened to traffic which alleviated congestion in downtown Altoona.  With that completed, attention turned to the section between the temporary interchanges at King/Claysburg interchange and Newry Lane which became marked as proposed on the 1986 Department of Transportation map.  It wouldn't take long for that gray, dashed line to be turned into a colored one as construction began on it the following year.  In 1988, the section from a new temporary interchange at PA 164 to the one at Newry Lane opened, which prompted its closure.  The final year of the 1980s saw the segment between King/Claysburg interchange and the temporary interchange at PA 164 open, and the temporary interchange closed.

After the Bedford to Altoona link had been completed, there was the gap between Altoona and Tyrone to close.  Construction began in 1991 to close that gap between 17th Street and the Tipton/Grazierville interchange.  It opened to traffic in 1995, creating an uninterrupted route from south of Bedford Springs to north of Tyrone:  free of cross traffic, traffic signals, and slow trucks which was a detriment on narrow, mountainous, old US 220.  All was not quiet on the expressway, as in 1996 another shield began to spring up next to the familiar US 220s:  I-99.  Representative Bud Shuster who was responsible for funds for the expressway construction the expressway designated an Interstate from Bedford to Tyrone.  In 1997, other lanes from PA 64 to I-80 were built to make it a four-lane highway.

December 28, 2001 was not a good day to be on the highway, as icy conditions caused a tractor-trailer full of garbage to overturn in Jersey Shore.  The accident cause state police to close down both the north and southbound lanes of US 220 for several hours.  What made things even more difficult was that most of the traffic on the highway was detoured onto it because Interstate 80 was closed due to a massive accident.  The highway reopened on Saturday, December 29.

After almost four years of construction, the next section to open was from the Mount Nittany Expressway to the Bellefonte Bypass on November 25, 2002.  Ribbon cutting ceremonies started at 10 AM at the Park Avenue interchange near Beaver Stadium, which marked the official opening of the expressway.  Once opened, the US 220 designation was moved to follow US 322 to State College then north to I-80 from the former alignment which received the Alternate US 220 designation.

Piece of ceremonial ribbon used to open the expressway
Piece of ceremonial ribbon used at the opening of the
section from US 322 to PA 26.
(PennDOT; courtesy of Geoff Hatchard)

The official name of the project was the PA 26 Relocation Project, which started in January 1999 and cost $195 million to build.  As other expressway projects in Pennsylvania, an open house was held on October 26, 2002 called a "Roll & Stroll."  Around 1,000 people are estimated to have walked, biked, skated and strolled along the new expressway.  A four-mile race to benefit the United Way of Centre County was held on the right-of-way, with Penn State's ROTC cadets participating with the public.  This section will not officially become part of I-99 until 2008 when the Bald Eagle to Mount Nittany Expressway section is completed.

Looking northward at the interchange with US 322 in State College
Looking northward at the interchange with US 322 in State College in
Summer 2002.  (PennDOT)
 

Looking north on the southbound lanes near Harrison Road
Looking north on the southbound lanes
near Harrison Road.  (Michael Brand)

 

Southbound at the PA 144 crossing (4/2000)
Looking southbound across PA 144 near Bellefonte in April 2000.
(Michael Brand)

 

Southbound at PA 144 near Bellefonte (10/2000)
Overpass at PA 144 under construction in October 2000.  (Michael Brand)

 

North from the southbound lanes at the 99/26/64 interchange
Looking north on the southbound lanes at the I-99/US 220/PA 26/PA 64 interchange.
The ramp above leads from I-99/US 220 south to PA 26/PA 64.  (Michael Brand)

After seven years of construction, and delays involving pyritic rock, a portion of the Bald Eagle-to-State College segment opened on December 17, 2007.  The northbound lanes from PA 350 to Skytop Mountain and southbound lanes from Port Matilda to PA 350 were supposed to open thirteen days earlier, but the opening was postponed to give crews more time to prepare.  The opening was then moved to December 13 before it was cancelled due to winter weather.

US 220 between Port Matilda and Skytop Mountain
While clean-up of acid rock keeps the southbound side of the expressway closed, US
220 has had its northbound and southbound directions split.

Even though the cleanup of the acid rock continues, PennDOT decided to open as many completed sections to move as much traffic off the antiquated US 220 as possible.  Northbound traffic will use a temporary ramp on Skytop to rejoin the existing alignment.  While the southbound lanes are still closed for acid rock clean-up operations, traffic will continue to use the old alignment and join the new expressway at the Port Matilda interchange.

View of Exit 52 before construction
Before construction began, traffic was narrowed to one lane and forced to
exit at PA 350.
 
View of Exit 52 during construction
During construction, traffic must detour onto a temporary roadway.  In the middle is the
former stub end and where the large dump trucks are parked is the old exit ramp.

Links:
Exit Guide
US 220 Auxiliary Routes
US 220 Pictures
I-99/US 220 Construction Progress Map
Interstate 99
Road to Ruin-US 220/US 322 - Taxpayers for Common Sense
Susquehanna Beltway - PennDOT
EcoCheck 99-The Environmental Influence of Pennsylvania Interstate 99 - Juniata College
Future Interstate 99-North of I-80 - Brian Polidoro
I-99 Interchange Browser - Tim Reichard
I-99/US 220 Construction Pictures - Tim Reichard
Interstate 99 - Andy Field/Alex Nitzman
Interstate 99 - David Steinberg
Interstate 99 in Centre County - Geoff Hatchard
Interstate 99 Pictures - Andy Field/Alex Nitzman
ISTEA/NHS/TEA-21 High Priority Corridor 9 - Andy Field/Alex Nitzman
Kurumi's Trippy Drive '71 - Scott Oglesby
Terminus of US 220 - Dale Sanderson
Terminus of US 220 in Pennsylvania - Tim Reichard
US 220 Corridor - Tim Reichard
US 220 Interchange Browser - Tim Reichard
US 220 Junction List - Tim Reichard
US 220/US 322 Pictures (Centre County) - Doug Lowmaster

 
UNDER CONSTRUCTION
DICK Corporation

BALD EAGLE TO MOUNT NITTANY EXPRESSWAY

Construction began in fall of 2000 from Port Matilda to State College with completion originally scheduled for late 2003, but has now been pushed to late 2008.  Project website:  http://i99.dickinfolink.com/.

Bald Eagle to Port Matilda PDF - PennDOT
Port Matilda to State College PDF - PennDOT

In February 2004, construction hit a snag when crews unearthed vast quantities of acid rock at Skytop Mountain.  Gary Byron, assistant regional director for the state Department of Environmental Protection said he has never seen a bigger potential for stream damage than the uncovering of this material.  "It's the worst I've seen, and I've been here 27 years," he said.  "The bottom line is, PennDOT's environmental-impact work for I-99 missed this geologic formation."  Between 500,000 and one million cubic yards of acid rock, previously sealed in geologic formations, is now exposed to rainwater that drains into Buffalo Run which is a tributary of Spring Creek.  Byron went on to say that the rock "is rare, but it is very wicked in chemical composition."  Soda ash briquettes are being used to neutralize the acidic drainage as it washes into the stream.  On March 8, the Department of Environmental Protection shut down construction in a half-mile section until a solution could be reached.  By August, the run-off had contaminated 19 wells requiring one home to have bottled water to supplant the contaminated stuff coming out of the faucets.  Three wells became contaminated during a 90 minute hearing in Harrisburg about the acid rock run-off.

A sediment basin near the PA 550 overpass used to monitor run-off
A sediment basin near the PA 550 overpass used to monitor run-off.  The mainline of the Interstate is on the
right side behind the orange safety fence.

 
Stormwater basin on the side of PA 550 near the overpass
Stormwater basin on the side of PA 550 near the overpass.
 

Well to monitor seepage into the groundwater.

Removal of the pyritic rock is now in the hands, or trucks, of an Indiana County company.  A $26 million contract to haul piles of approximately 650,000 cubic yards of the rock 75 miles away to a fly ash pit near Ebensburg was signed by Robindale Energy Services in January 2006.  An additional $14 million will go to covering up the 400,000 cubic yards that will remain on Skytop Ridge.  When started, hopefully this summer, the operation will have 50 trucks making three round trips a day for 200 days or 30,000 truckloads.  The fly ash in the mine will help neutralize the sulfuric acid.  The other option PennDOT explored was building an "engineered rock placement area" to dump the pyritic rock on Skytop.  A third option to use Bauxsol was dismissed in 2005.  Even though it worked effectively, the state determined it would be too difficult to apply it to all of the affected areas.

Some of the rock will have to stay on the ridge, either on a rock face or to act as support for the Interstate.  To shield it from oxygen and water, the areas will be covered with three layers of impermeable plastic as well as lime-kiln dust and synthetic webbing.

In April 2006, Transportation Secretary Allen Biehler announced the total cost of clean up would be $50.5 million.  By 2008, the cost rose to $79 million because of two factors.  Two years earlier oil was trading at $70/barrel and officials were expecting to only have to truck 667,000 cubic yards, rather than 1 million cubic yards, of rock to the disposal site.

Acid Rock Drainage - PennDOT District 2

View from PA 550 looking towards the current US 220/US 322 alignment
View from PA 550 looking towards the current US 220/US 322 alignment and future Interstate
alignment.  The bridge is an overpass for I-99
 
Looking southbound towards Bald Eagle Mountain
Looking southbound towards Bald Eagle Mountain at
the Gray's Wood interchange in Summer 2002.
(PennDOT)
 
Facing southbound on Bald Eagle Mountain
Facing southbound on Bald Eagle Mountain in September 2002.  The
highway running through the picture is the current alignment for
US 220/US 322.  (PennDOT)
 
Facing northeast from Port Matilda towards State College
Facing northeast from Port Matilda towards State College in September
2002.  (PennDOT)

INTERCHANGE WITH I-80
Currently this is a modified diamond interchange.  The new interchange will be a new expressway to expressway, high- speed, semi-directional Y at the location of the current Exit 161.  An additional exit for local highways will be constructed east of the interchange.  For a detailed plan of the interchange, see http://www.pahighways.com/interstates/I80-I99interchange.pdf.

On March 6, 2006, PennDOT announced changes to the interchange to avoid a similar fate to the Skytop Mountain section.  The revised plan moves the interchange closer to Nittany Creek, reduces the amount of material to be moved by 400,000 cubic yards, and retaining walls instead of hillside excavation.  The discovery of pyrite is not new as PennDOT had known about it for two years and as more surveying and core borings took place, the necessity of reducing the impact of the interchange on the seam became more apparent.  The changes will not result in any cost savings, but compared to paying for remediation of the acid rock drainage, it will end up cheaper than the alternative.  Bidding on the $80 million high-speed interchange will begin in December 2008, but the local interchanges at Jacksonville Road and I-80 at Shay Lane are scheduled to be bid at the end of 2006.

NORTH OF I-80
According to Eric High, project engineer for PennDOT District 3, it has not been decided to extend the I-99 designation to I-86 in New York state via US 220 and US 15 as of yet.  There are two gaps in the expressway between I-80 and Williamsport:  I-80 to Salona and Jersey Shore to Williamsport.  Environmental studies and preliminary engineering began by summer 2000 for the Jersey Shore to Williamsport section.  The I-80 to Salona section is not as far in the construction process.  PennDOT is studying traffic patterns to determine where to connect the expressway to I-80.  However, with the release in 2004 of the revised 12-Year Transportation Program, both segments are up in the air due to being deferred.  However, I-99 milemarkers have appeared on the expressway from PA 477 to PA 287.

End of the expressway at PA 477 with a stub indicating a future extension to I-80
End of the expressway at PA 477 with a stub indicating a future extension
to I-80, which is only three miles away.  (PennDOT)


Information INFORMATION
Southern
Entrance:
Maryland state line 11 miles south of Centerville.
Northern
Terminus:
NY 17 in Bradford County.
Length: 238 miles
National
Highway
System:
Maryland state line to Pennsdale
US 6 to NY 17
Names: Appalachian Thruway, Bud Shuster Highway, Bald Eagle Valley Road, Plank Road, 28th Division Highway, Mount Nittany Expressway, Z. H. Confair Memorial Highway, Keystone Shortway, Frank D. O'Reilly Jr. Highway, Marine Corps League Memorial Highway, Main Street, Cliff Avenue, German Street, Front Street, and Bridge Street
SR
Designations:
SR 0220
SR 0099:  PA 56 to PA 350
SR 6220:  PA 350 to Skytop Mountain (northbound only)
SR 0322:  Port Matilda to State College (southbound only)
SR 6026:  State College to PA 26
SR 0026:  PA 26 to I-80
SR 0080:  Exit 158 to Exit 178
SR 0180:  US 15 to Pennsdale
Counties: Bedford, Blair, Centre, Clinton, Lycoming, Sullivan, and Bradford
Expressway: Business US 220 to Skytop Mountain
Business US 322 to I-80
Exit 158 to Exit 178 on I-80
PA 477 to PA 287
West Fourth Street in Williamsport to Exit 15 of I-180
Main Street to US 6
PA 199 to the New York state line
Multiplexed
Routes:
I-99:  Exit 1 to Exit 52
US 322:  Port Matilda to State College
PA 26:  Exit 81 to I-80
I-80:  Exit 158 to Exit 178
PA 44:  PA 44 North to Jersey Shore
US 15:  Exit 29 to Exit 27B
I-180:  Exit 29 to Exit 15
PA 42:  Beech Glen to Muncy Valley
Truck PA 42:  Muncy Valley to Laporte
PA 87:  Dushore
Former
Designations:
PA 64  (1927 - 1928):  Maryland state line to Bedford Springs; Port Matilda to Martha Furnace
PA 46  (1927 - 1928):  PA 550 to Business US 322
PA 44  (1927 - 1928):  Graysville to Williamsport
PA 85  (1927 - 1928):  I-180 to Hughesville
PA 42  (1927 - 1928):  Hughesville to PA 199
PA 250  (1928 - 1933):  PA 550 to Business US 322
PA 642  (1928 - 1941):  I-180 to Hughesville
PA 120  (1970 - 1978):  I-80 to PA 447
PA 120  (1977 - 1978):  PA 447 to PA 120
BicyclePA Route J
BicyclePA Route:
PA 414 to Main Street

Back to Pennsylvania Highways
Back to Pennsylvania US Highways
Page updated September 04, 2008.
Content and graphics, unless otherwise noted, copyright © Jeffrey J. Kitsko. All rights reserved.
Information sign courtesy of Richard C. Moeur.
Information courtesy of the Pennsylvania Department of Transportation, Rand McNally, WNEP-TV Scranton, Centre Daily Times, and WPXI-TV Pittsburgh..